Purchase all necessary materials and components, and manufacture tools. This usually takes 4-6 weeks to complete. Once the materials arrive at our factory, IQC department will inspect raw materials to ensure that the materials used in production are all qualified products.After that,the bill of materials (BOM) will be organized by our inventory experts and delivered to the production team assemblers for next steps.

                     PURCHASING & IQC

                      MANUFACTURING

Once the customer confirms the pre-production sample, we will immediately notify the production line, the production line will apply for picking, verification, spare parts and corresponding production tools, and then arrange the production process to promote efficient production.Once mass production starts, we will confirm the delivery time. Generally speaking, our delivery time is about 4 weeks. The specific time depends on the complexity and scale of the project. Whether it is the complexity of the project or the size of the order and scale,we have a complete production facility and a professional technical team to meet your manufacturing needs.


                                                        TESTING

We will conduct multiple rounds of testing and full inspection of the products before shipment. Usually, our QA/QC personnel will 

test the products before and after production, assembly and packaging to provide customers with quality-assured products 

and ensure that the products are specifically designed for their unique applications.